Engine system

Open Deck SOx Scrubber And Open Deck Installation

Open Deck SOx Scrubber And Open Deck Installation

The Open Deck scrubber is a next generation CleanSOx Compact scrubber. It is compatible with all sources including boilers, delivering maximum emission performance. The newly developed SOx scrubber (“naked scrubber”) reduces total installed weight of infrastructure by more than two thirds, which means significant capex savings on the scrubber itself and no need to strengthen the ship structure prior to installation.

The Open Deck scrubber reduces installation time significantly, and is as close to “plug and play” as you can get.  A pre-fabricated electric room is one of the solutions that enable significantly shorter installation time. All critical components on the open deck scrubber are protected from harsh sea conditions. The scrubber is made of high-grade stainless-steel material and is easily incorporated with the ship’s boilers. It comes with a proven zero back pressure construction that has already had more than 10,000 hours of operation with boilers the past few years. Favourable placement of electronics and simplified cable connections make it easy to install and maintain. There is no need to make a major design change or rebuild of vessel with the Open Deck Scrubber. It comes in hybrid, open and closed loop. This scrubber reduces the total cost of installation and commissioning significantly.

Key Features

No back pressure :

  1. No fuel penalty.
  2. AE’s can start connected to EGC unit(s).
  3. No restrictions running AE’s in part load – no impact on – engine parameters (EIAPP).
  4. Boilers connected.

Closed loop/open loop operation :

  1. Open loop 0,5% Sulphur – sea water only when – Sulphur < 3,5%  (Given that exhaust gas largely comes from Diesel engine).
  2. Open loop 0,1% Sulphur – sea water + NaOH dosing; can transit any water – no alkalinity restrictions.
  3. Closed loop – sea water + NaOH dosing; only required – where zero discharge is called for pH.
  4. Open loop 0,5% Sulphur – process water + dilution device.
  5. Open loop 0,1% Sulphur – plus NaOH (pH 6,5 at 4m or pH 6 – overboard).

Footprint and savings :

  1. Height reduced by 66%.
  2. Weight reduced by 66%.
  3. Cost reduced by 30%.

Benefits :

  1. Operates with one fuel in all areas and harbours.
  2. No need for major rebuilding of the vessel; minimum footprint requirements.
  3. Reduced installation and commissioning time.
  4. Future proof solution.
  5. Minimum CAPEX and OPEX.

Open Deck Installation

Cut installation cost and time with an open deck scrubber installation.

The newly developed “naked scrubber” reduces total installed weight of infrastructure by more than two thirds, which means significant CAPEX savings on the scrubber itself and no need to strengthen the ship structure prior to installation.

The simplified scrubber also reduces installation time from 4-5 weeks to 3 weeks, thereby cutting docking costs significantly too. A prefabricated electric room is one of the solutions that enable significantly shorter installation time. All critical components on the open deck scrubber are protected from harsh sea conditions.

The Compact “naked” hybrid scrubber can run with both open and closed loop, thereby avoiding conflict with ports that have prohibited the use of open loop scrubbers. It can easily be inspected and maintained by the vessel crew in order to maximize operational uptime.

The scrubber is made of high-grade stainless-steel material and is easily incorporated with the ship’s boilers. It comes with a proven zero back pressure construction that has already had more than 10,000 hours of operation with boilers the past few years. Favorable placement of electronics and simplified cable connections make it easy to install and maintain. Which is often a time-consuming process during the installation.

Key Features :

Reduced installation cost :

  • Installation time reduced from 4-5 weeks to 3 weeks.
  • Prefabricated electrical room with cabinets installed.
  • Installation weight reduced by two thirds.

Closed loop/open loop operation :

  • Open loop cleaning to 0,5% Sulphur equivalence with seawater only.
  • Open loop cleaning to 0,1% Sulphur equivalence with seawater + NaOH – No alkalinity restrictions.
  • Closed loop – seawater + NaOH dosing where zero discharge is called for.

pH :

  • Open loop 0,5% Sulphur – seawater only (pH 6,5 at 4m).
  • Open loop 0,1% Sulphur – seawater +NaOH (pH 6,5 at 4m or pH 6 at shipside in VGP).

Benefits

One Fuel, All sources, All waters, All time.

Open Deck SOx Scrubber And Open Deck Installation

Read more articles :

Indonesia Marine Equipment

INAMEQ is provide all marine product (equipment and sparepart) and news about marine product to help procurement team at shipping industry, ship contractor, port contractor and oil gas company finding competitive price to directly connect with manufacturer and authorized local and international.

Recent Posts

Rheonik Fuel Consumption For Marine Application

Rheonik Fuel Consumption For Marine Application, Rheonik Coriolis mass flow meters have been used for…

1 year ago

Coriolis Mass Flow Meters For Marine Fuel Consumption Application

Coriolis Mass Flow Meters For Marine Fuel Consumption Application, Rheonik Coriolis mass flow meters have…

1 year ago

Marine Fuel Consumption Dengan Coriolis Mass Flowmeter

In commercial shipping, now more than ever, fuel consumption measurements are an important part of…

1 year ago

Marine Fuel Consumption Dengan Memakai Rheonik

In commercial shipping, now more than ever, fuel consumption measurements are an important part of…

1 year ago

Fuel Consumption Bahan Bakar di Kapal Dengan Fluidwell Tipe F127

Mengukur konsumsi bahan bakar di sebuah mesin atau engine, disini kita melihat penjelasan bagaimana bahan…

1 year ago

Mengukur Konsumsi Bahan Bakar di Kapal Dengan Fluidwell Tipe F127

Mengukur Konsumsi Bahan Bakar di Kapal Dengan Fluidwell Tipe F127 Mengukur konsumsi bahan bakar di…

2 years ago

This website uses cookies.