Tanker crude oil washing procedure
Tanker crude oil washing procedure

Tanker crude oil washing procedure

Tanker crude oil washing procedure

Crude oil washing operation onboard oil tankers involve many hazards and careful consideration will need to be made for safe planning and execution. Prior operating crude oil washing onboard utmost diligence in planning and most careful consideration will need to be made for a safe working area. Following are the basic guidance for quick reference .The Chief Officer, as qualified by the requirements as laid down by flag state administration of the ship and any port regulations that may be in force locally, shall supervise all COW operations.

What is Crude oil ? – Any liquid hydrocarbon mixture occurring naturally in the earth. Properties of crude oil vary considerably depending upon its origin. Crudes generally have a flash point below 26.7° C and a Reid vapour pressure from about 42 to 84kPa. Crude oils have contaminants such as sulphur and vanadium compounds which encourage corrosion of steel. Crude oils with high and low sulphur contents are referred to as “sour” and “sweet” crude oils respectively.

Supervision Of Crude Oil Washing (COW) Operations

If the Chief Officer is less experienced, the qualified Master shall assist in the supervision of the operations. He shall be knowledgeable about the contents of the Operations and Equipment Manual.

The Chief Officer shall prepare a detailed cargo oil discharge and Crude Oil Washing Plan prior to arrival discharge port. He shall carry out the operations in accordance with the plan.

Reference should also be made to the latest IMOs publication Crude Oil Washing Systems and ICS/OCIMFs publication- the ISGOTT.

The Master, Chief Officer, Chief Engineer and other officers engaged in Crude Oil Washing shall be fully familiar with the crude oil washing system provide on board the vessel.

Discharging Strategy

The discharge sequence is to be such that the vessel has a good draining trim at an early stage in the discharge. This will allow early effective stripping.

When planning for COW, the frequency and time of removing the cargo pumps from discharge operations should be planned for minimum, for efficient discharge. Under no circumstances are Crude Oil Washing operations to be commenced without operational inert gas equipment. Any Butterworth tank washing water heaters fitted must be blanked off and drained at all times. Before each Crude Oil Washing operation a full pressure test of the system must be carried out. The procedures and instructions contained in the vessels Crude Oil Washing Operations and Equipment Manual must be strictly adhered to.

Terminal (Refinery) request

Special details, port requirements and special precautions or procedures should be discussed with all personnel involved in the discharge operation. (eg. any special requirements for final discharge of crude (Fresh or Dirty) prior to completion of discharge operations, etc).

COW Manual

Crude Oil Washing and related operations shall be carried out in accordance with the Operations and Equipment manuals (COW manuals) approved by the class on behalf of flag state Government and provided on board each ship.

Advance Notice In Port

Where it is required to carry out crude oil washing during cargo discharge, the Master should inform the terminal and seek terminals permission. The same shall be discussed in detail, prior to start of cargo operations in the Pre cargo transfer safety meeting held with the terminal. COW should proceed, only after terminals permission is granted.

For crude oil washing carried out in Japanese ports, the Master shall obtain approval of the Charterer, consignee, unloading terminal, harbour master and others.

Safety Measures For Crude Oil Washing Operations

For crude oil washing, the Chief Officer shall carry out the following safety matters and shall also observe the safety regulations on crude oil washing provided by the terminal (if any). Some terminals require the vessel to complete the terminal specific safety Questionnaire / Permit / Checklists prior to granting permission for approval. In addition, he shall follow the safety precautions as laid in the relevant section of the Latest version of ISGOTT.

Between tank cleaning lines and overboard discharge or Engine Room

a). Tank Cleaning Heaters (to be blanked).

b). Overboard Discharge Lines (to be isolated).

c). Portable Washing Machines (not to be used for COW and their hydrants blanked).

d). Cargo Sea Chests (to be blanked).

Pressure Test before Arrival Port

Conduct pressure test of COW lines prior to arrival. Any leakages, must be rectified and the system, re-tested to be proved leak free.

Prior to commencement of COW operations ensure that the oxygen content of the cargo oil tanks being washed is below 8%. Refer to Cargo Oil Tank Oxygen & H2S monitoring Record for Voyage of Double Hull Operation and Oil Tank Monitoring Record.

During COW operations ensure that the cargo oil tank pressure is minimum 200 mmAq and that the IGS produces inert gas with an oxygen content of less than 5%.

Prevention of Electrostatic Generation

Do not use crude oil containing water, as washing oil.

Note

Mixtures of crude oil and water can produce electrically charged mist, during washing with an electrical potential considerably in excess of that produced by Dry crude. Refer to the relevant section in ISGOTT for precautions for Static Electricity generation and its hazards.

Before using such oil as a source of crude oil for washing, any water which has settled down during the voyage must be de De-bottomed (by discharging) to terminal by at least one meter in depth.

Where load-on-top method has been used for cargo in slop tank (previously containing oily water mixtures), the whole cargo oil in that slop tank which needs to be used as a source of oil for crude oil washing must be discharged ashore and then refilled with fresh crude from other tanks.

Communication equipment

Ensure only intrinsically portable radios are used on deck during COW operations. Deck crew shall be in prompt communication with Duty officer & chief officer.

Suspending Crude Oil Washing

Suspend COW operations immediately if :

a). The oxygen content of Inert Gas being supplied exceeds 8% by Volume.

b). Malfunction or stoppage of IG system where the internal pressure of the cargo oil tank can become negative.

c). Any indication of cargo oil leakage or malfunction in the COW system.

d). COW operation is not carried out in accordance with the COW operation plan, or if communication between the CCR and main deck is lost.

e). Discharge operations are to be suspended due to lightening in the vicinity of the vessel.

f). If the required necessary safety precautions as described and covered above cannot be followed.

g). If terminal instruct to do so

Prevention Of Air Pollution

Follow the Precautions Against Air Pollution to minimize petroleum vapor emissions

Crude Oil Washing Plan

The Chief Officer shall prepare a detailed COW plan in accordance with the Crude Oil Washing Plan in order to carry out the COW operation in the most safe and efficient manner.

Prior to arrival of the Port, or at the earliest opportunity thereafter, the Chief Officer shall conduct a Pre transfer cargo safety meeting with all personnel involved in the COW operation to ensure that all have read and fully understand the plan.

Personnel Arrangement For Operations

Carry out Crude Oil Washing by the adequate personnel arrangement as per COW plan under the reference of the Personnel Arrangement for Crude Oil Washing.

Points Of Crude Oil Washing

COW operations shall always be carried out in accordance with the Crude Oil Washing Operations COW operations for High Viscosity & High Pour point (Heated) cargoes shall always be carried out in accordance with the Crude Oil Washing of Heated Cargo.

Recording

The Chief Officer shall ensure that the following records are kept during COW operations :

a). Crude oil washing check list.

b). Oil record book : According to the Procedures for Entry in Oil Record Book.

c). Deck logbook : Date and time, and results of a COW line pressure test and operation test of related equipment.

d). Crude Oil Washing Record.

e). Cargo Oil Tank Oxygen & H2S monitoring Record for Voyage of Double Hull Operation and Oil Tank Monitoring Record: It is the Measurement record of oxygen level in tanks Before entering Load port, After loading cargo, Before entering discharge port and Before crude oil washing.

f). Inert gas record : Log for 4 hourly IG pressure monitoring of cargo tanks, in addition to Continuous pressure recording by fixed recorder of IGS main line pressure after loading, until completion of discharge.

Ships Fitted with Fixed Foam Systems

In ships fitted with fixed foam systems the Chief Officer will satisfy himself that the system is fully operational prior to commencing cargo, C.O.W. or tank cleaning operations.

  • Foam tanks must be checked to see that they are full.
  • Isolating valves must be tested to see that they are free.
  • Foam monitors must be uncovered and made ready.
  • At least one portable foam applicator must be connected to a hose and foam hydrant. This is to be placed about 10 metres forward or aft but always upwind of the manifold area.

A fire hose and jet/spray nozzle must be placed alongside, connected to the fire main.

Read more :

author

Indonesia Marine Equipment

INAMEQ is provide all marine product (equipment and sparepart) and news about marine product to help procurement team at shipping industry, ship contractor, port contractor and oil gas company finding competitive price to directly connect with manufacturer and authorized local and international.

Similar Posts

3 Comments

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.